A single-head TDF flange former forms one panel edge per pass: you feed the left edge, turn the panel, and feed the right edge. A dual head TDF flange machine carries two forming heads on one frame, driven from a single shaft, so both edges of the panel are flanged in one pass with no turning. The DTDF-15 is the representative model in the Preda lineup: 0.5–1.2 mm galvanized sheet, TDF profile, 15 m/min forming speed on both edges simultaneously, 2.2 kW motor.

The commercial claim is straightforward — roughly double the flanging throughput per handling. The engineering claim is more nuanced: both heads share one drive and one frame, so every fault shows up as a symmetry problem between the two flanges. Understanding that is the difference between a machine that pays back in months and one that gets bypassed.
| Parameter | DTDF-15 |
|---|---|
| Material thickness | 0.5–1.2 mm galvanized |
| Flange type | TDF standard |
| Forming speed | 15 m/min, both edges in one pass |
| Motor power | 2.2 kW |
| Heads | Dual (2 sides), driven from one shaft |
| Control system | PLC with touchscreen |
| Drive | Heavy-duty gear drive |
| Construction | Heavy-duty steel frame |
| Certification / warranty | CE / 2 years |
For reference, the larger duplex class in the same family covers 0.5–1.2 mm (T-12) and 0.8–1.5 mm (T-15) with a 35±0.5 mm flange height at roughly 2,000–2,400 kg and 2900×1600×1100 mm overall — the numbers to check against door widths, crane capacity and floor space.
Dual-head forming halves the handling per panel, but the saving only materialises if your infeed can keep both heads fed. The widely used threshold is around 600 panels per day: below it, a single-head machine with two operators is usually the better return; above it, the dual head starts paying for itself.
| Configuration | Passes per panel | Panels per hour | Operators | Best fit |
|---|---|---|---|---|
| Single head T-12 | Two passes plus a turn | 70–110 | One | Standard commercial volume; the cheapest way to stop hand-applied angle iron |
| Single head T-16 | Two passes plus a turn | 70–110 | One | 18 ga work at moderate volume — gauge is the constraint, not throughput |
| Dual head DTDF-15 | One pass, both edges | 140–220 | Two at the infeed at full speed | Flanging is the bottleneck and volume exceeds ~600 panels/day; also suits shops short of floor space for two machines |
| Duplex TDF with cleat | One pass plus corner preparation | Comparable | Two | Corner preparation is your second bottleneck |
| TDC flange former | As configured | Lower — deeper section | As specified | The specification calls for TDC — a different system, not a heavier TDF |
Commission a dual-head machine in this order and it will hit rated output in the first week:

Dual-head faults are almost always symmetry problems — the two heads disagreeing. That is good news, because symmetry is measurable and adjustable without parts. Measure both flanges before you adjust anything.
| Symptom | Most likely cause | What to do |
|---|---|---|
| One flange consistently different from the other | Head gap settings differ — one head was adjusted and the other was not | Form a test panel, measure both flanges, adjust the head that is out in 0.02 mm steps; never adjust both at once or you lose the reference |
| Panel exits at an angle | Heads not aligned to the guide fence; one head is pulling harder and rotating the panel | Check both heads against the fence with a 1 m square and shim; re-check after heavy-gauge runs |
| Output no better than the single-head machine it replaced | Infeed cannot keep up — the machine waits for panels | Add a second operator or a powered infeed table; time the cycle — if the heads idle more than they form, this is the cause |
| Flange quality fine at the start of a batch, poor at the end | Gauge variation within the coil — often wider than shops assume | Measure actual thickness at the start and end of the batch; if it varies more than 0.05 mm, speak to the coil supplier before blaming the machine |
| Both heads noisy under load | Drive coupling or gearbox shared by both heads | Stop and check gearbox oil and coupling alignment; do not run through the noise — a dual head transmits high torque |
| Machine trips only on the first start of the day | Both heads starting under load — inrush on a supply sized for one | Start with the heads disengaged, then engage; if it persists, the supply or starter needs upsizing |
What to verify before you place the order:

TDF locks panel corners with cleats over the formed flange; TDC uses clips bolted through the flange. TDC is the stronger joint for large cross-sections and higher static pressure. The profiles are not interchangeable — the choice drives which machines you buy.
The flange geometry differs, so retrofitting is a system decision rather than a machine decision. If you are upgrading an angle-iron shop to TDF, budget for corner tooling and cleat supply alongside the former.
0.5–1.2 mm galvanized. If your work regularly runs 18 ga and heavier, look at the T-16 class single head or the T-15 duplex, where gauge rather than throughput is the constraint.
Only if corner preparation is genuinely your bottleneck. If panels queue at the corner bench, either add a dedicated corner station or step up to a duplex former with integrated cleat forming. If the corner bench keeps pace, skip it.
15 m/min on both edges simultaneously. In practice that is roughly 30 seconds of flanging per duct section — against 10–15 minutes to weld an angle-iron frame, and with no rivets.