A spiral duct forming machine — usually called a spiral tubeformer — continuously rolls strip into a rigid round tube with a helical lock seam. Galvanized, stainless or colour-coated steel leaves the decoiler, passes through levelling rollers that remove coil memory, and is wrapped around a forming mandrel while the seam station rolls and crimps the interlocking profile. A flying saw cuts the continuous tube to length without stopping the line, and the finished tube is discharged onto the collection table.
The geometry does the structural work. Because the seam runs in a continuous helix, the tube gains stiffness from the spiral itself — a spiral duct of a given gauge is measurably stiffer than a comparable longitudinal-seam pipe of the same material — and the crimped seam delivers the leakage performance round systems are specified against. That combination is why spiral duct dominates commercial HVAC main runs, industrial dust collection and exhaust work.
The specifications below are for the band-type build that most export catalogs list as the standard spiral duct forming machine. Mould-type, heavy-duty and plasma-cut builds differ mainly in diameter range and cutting method; treat every figure as build-dependent and confirm it on the quotation.
| Parameter | Band-Type Spiral Duct Forming Machine |
|---|---|
| Duct diameter | 80–1500 mm; the model family extends to 1600 mm and beyond |
| Strip thickness | 0.4–1.0 mm on the band-type build; the family is quoted to 1.2 mm, and heavy-duty builds to 1.5 mm |
| Strip width | 137 mm standard |
| Forming speed | 1–38 m/min, adjustable |
| Main motor | 5.5 kW |
| Cutting motor | 4 kW (flying saw) |
| Roll tooling | GCr15 bearing steel forming rollers, hardened |
| Drive | Spiral bevel gear reducer (low noise) |
| Decoiler | Mechanical expanding type, 1.5 t capacity, 480–610 mm inner diameter |
| Control | Inverter plus PLC; touchscreen on current builds |
| Pneumatic hydraulic station | 8 kgf/cm² |
| Footprint / weight | 3500×2800×2580 mm; about 2500 kg |
| Materials | Galvanized steel, stainless steel, colour-coated steel, aluminium |
| Certification / warranty | CE; warranty terms vary by build (1–2 years) — confirm at quotation |
Two numbers deserve attention when comparing quotes. The diameter range sets which jobs you can bid at all — 80–1500 mm covers essentially the whole commercial spiral order book, while a machine specified only to 1200 mm quietly excludes the large-diameter industrial work. The strip thickness ceiling sets your gauge flexibility: 1.0 mm is the band-type standard, and if you regularly run 1.2 mm at large diameters you are shopping in the heavy-duty class, where the frame and drive are built for it.
The same tubeformer job is solved several ways in this equipment class, and the differences are mechanical, not cosmetic:
| Build | Forming principle | Diameter changeover | Choose it when |
|---|---|---|---|
| Band type (flexible) | Forming bands define the tube geometry; the mandrel stays in place | Quick — a setting adjustment, no mould swap | Your diameter mix varies day to day |
| Mould type | Fixed mould per diameter on a classic mandrel machine | Mould swap — minutes to an hour | You run long batches of one diameter |
| Heavy duty (PD-2000 class) | Reinforced frame and drive for thicker strip at large diameters | As per band or mould configuration | Large-diameter industrial duct is routine work |
| Plasma cut (PD-1600-PLASMA class) | Integrated plasma cutting instead of a saw | As per base machine | Cut-to-length accuracy and throughput dominate |
The band-type machine is the default choice for a general commercial shop because most shops run a diameter mix, not a single diameter. The mould-type machine wins on long runs of one diameter, where the changeover cost amortizes to nothing — but the moment the order book fragments into many diameters, mould changes eat the advantage. Heavy-duty builds carry a premium that is only justified when heavier gauge at large diameter is routine, and plasma cutting replaces a separate downstream operation rather than improving the forming itself.
The classic sizing mistake is buying for the largest duct you have ever made instead of the mix you actually run — which buys idle capacity and floor space. Work through your last twelve months of orders: if most of your round duct falls between 100 and 1000 mm, a mid-range tubeformer is the right tool and the large-diameter machine is a cost you will carry for years.
Forming speed is quoted up to 38 m/min, but the honest planning number is output in finished ducts per hour. A 3 m tube at a realistic 10 m/min forming speed leaves the machine in under 20 seconds; with loading, seam start-up and discharge, one operator typically turns out 30–60 ducts per hour. Compare that with manual forming, where two or three workers manage a fraction of that — the payback case for the machine is labour, not speed for its own sake.
A tubeformer produces a helix, and every diameter needs its own set-up. Shops that write settings down produce saleable tube from the first hour; shops that set by eye produce a morning of scrap. The discipline that matters:
The machine forms and cuts tube. Flanging the tube ends for bolted connections is a separate operation on a spiral duct flanger, and beading or other end detailing is downstream again. Budget the line, not the machine: decoiler, tubeformer, cutting, flanging and handling. The decoiler deserves specific attention — the 1.5 t mechanical expanding type with a 480–610 mm inner diameter covers standard export coils, but an oversized or undersized coil will not seat properly and tension problems follow for the life of the machine.
Before the machine is crated, insist on a test run with your own material and check:
| Symptom | Most likely cause | What to do |
|---|---|---|
| Diameter too large or too small | Helix angle set for a different diameter | Re-set the angle from the diameter table; run 3 m of scrap before measuring; then record the setting |
| Diameter drifts during a run | Strip tension unstable | Stabilise tension first; only adjust geometry if drift persists with stable tension |
| Seam leaks or looks open | Incomplete lock formation; poor strip edge condition | Inspect the lock on a cut section; check the strip edge for burrs; do not raise speed to close the seam |
| Tube surface marked or scored | Roll damage or debris in the forming head | Clean rolls with a brass brush, never steel; check the strip edge — this often starts after a slitter blade change |
| Cut length inconsistent | Length encoder or stop drifted | Check the length setting on the first and last piece of each batch and re-lock it; log for a week |
| Machine labours on heavier gauge | Material above the roll set specification | Verify thickness with a micrometer against the roll set spec; never force thicker material through |
Galvanized steel is the standard; stainless, colour-coated steel and aluminium run with the correct roll set and surface handling. Strip thickness for the band-type build is 0.4–1.0 mm, with the family quoted to 1.2 mm and heavy-duty builds to 1.5 mm.
On a band-type machine, a diameter change is a setting adjustment, not a mould swap — typically minutes once the settings are recorded. On mould-type machines, budget for the mould change itself.
Size for your order book mix, not your largest-ever duct. The commercial sweet spot for most shops is 100–1000 mm, well inside the standard 80–1500 mm range.
Yes — a flying saw cuts the continuous tube without stopping production. Plasma-cut builds integrate cutting in line and are chosen when cut-to-length accuracy and throughput dominate.
Not directly. Oval and flat-oval duct is a separate operation — an ovalizer working on formed round tube, or a dedicated oval machine. Confirm at quotation if oval work is part of your mix.